防水堵漏方法 |
添加时间:2021/12/17 14:23:09 浏览次数: |
防水堵漏方法 Waterproof and plugging methods 一、地下室工程 1、 Basement engineering 1侧墙、底板板面渗水 1. Water seepage on side wall and bottom plate 原因: reason: (1)混凝土施工质量差,存在微孔渗透; (1) The construction quality of concrete is poor, and there is micropore penetration; (2)防水涂层粘结不牢或损坏。 (2) The waterproof coating is not firmly bonded or damaged. 堵漏措施: Plugging measures: (1)将渗水部位清理干净,用水泥基防水涂料作堵渗处理。 (1) The water seepage part shall be cleaned up, and the cement-based waterproof coating shall be used for plugging. (2)将渗水部位清理干净后,用水乳型氯丁橡胶沥青防水涂料等配合纤维增强材料作堵渗处理。 (2) After the water seepage part is cleaned up, the water emulsion chloroprene rubber asphalt waterproof coating and other fiber reinforced materials are used to block the seepage. 2地下室大面积严重漏水 2. Serious water leakage in large area of basement 原因: reason: (1)混凝土配合比及施工质量不良蠕动泵 保定网站建设 保定网站制作 保定网络公司 保定办公家具 保定轻钢别墅 ,存在灌通的孔洞; (1) The concrete mix proportion and construction quality are poor, and there are grouting holes; (2)由于各种原因使地下室出现裂缝; (2) Cracks appear in the basement due to various reasons; (3)防水涂层施工质量不好或防水涂层延伸性不够,而造成防水层拉裂。 (3) The construction quality of waterproof coating is not good or the elongation of waterproof coating is not enough, which causes the waterproof layer to crack. |
上一页 墙壁防水做在哪 |
下一页 防水材料选择应仔细斟酌 |
Copyright © 技术支持:遨游网络